首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 703 毫秒
1.
Environmental impact assessment (EIA) has been promoted as an instrument for preventive environmental management in construction projects, but its performance in safeguarding the environment through influencing project decision-making is questioned. This paper probes the underlying reasons from a governance perspective as an important supplement to the regulatory and technical perspectives. A framework, with process integration, professional governance, and public engagement being its key components, is proposed to analyze the governance arrangements that enable or inhibit the effective functioning of EIA, based on which a comparative study of three infrastructure projects in China, the United States and Finland was conducted. The results reveal that, while the level of process integration and public engagement of EIA determines the degree to which EIA influences project decisions, it is the professional governance that controls the accountability of EIA. The paper has implications on institutionally where efforts should be directed to improve the performance of EIA.  相似文献   

2.
Large-scale public infrastructure projects have featured in China’s modernization course since the early 1980s. During the early stages of China’s rapid economic development, public attention focused on the economic and social impact of high-profile construction projects. In recent years, however, we have seen a shift in public concern toward the environmental and ecological effects of such projects, and today governments are required to provide valid environmental impact assessments prior to allowing large-scale construction. The official requirement for the monitoring of environmental conditions has led to an increased number of debates in recent years regarding the effectiveness of Environmental Impact Assessments (EIAs) and Governmental Environmental Audits (GEAs) as environmental safeguards in instances of large-scale construction. Although EIA and GEA are conducted by different institutions and have different goals and enforcement potential, these two practices can be closely related in terms of methodology. This article cites the construction of the Qinghai–Tibet Railway as an instance in which EIA and GEA offer complementary approaches to environmental impact management. This study concludes that the GEA approach can serve as an effective follow-up to the EIA and establishes that the EIA lays a base for conducting future GEAs. The relationship that emerges through a study of the Railway’s construction calls for more deliberate institutional arrangements and cooperation if the two practices are to be used in concert to optimal effect.  相似文献   

3.
Abstract: New criteria, pollutant load of unit area (PLUA), are developed for sustainable water quality management, which not only avoids degrading water quality but also considers the equity of development between different generations. A simulation‐optimization model is established to determine PLUA, in which uses the QUAL2E model to simulate pollutant transport and formulates a linear programming model to optimize the objective of maximal loads (carrying capacity). Two watersheds, the Touchen creek and the Keya creek, both in Taiwan, are taken as case studies. The PLUA criterion is applied to several existing projects which have passed environmental impact assessment (EIA). The results show that if the Hsinchu Science‐Based Industrial Park discharges wastewater to the Touchen creek, the total pollutant discharge of 85.6 kg/day exceeds the allocated load. Consequently, a waste reduction of at least 23.4% is required. Although these existing projects have passed EIA, most of them violate the criterion of PLUA and thus contribute to continued degradation of water quality. This study suggests developing PLUA as a part of the process of strategic environmental assessment (SEA) for watershed management plans and then applying it to EIA as a criterion for new project assessment. Furthermore, if carrying capacities of all pollutant discharges and resource uses can be translated into loads per unit of area, an integrated sustainable watershed management plan can be developed.  相似文献   

4.
Virtually every environmental planner at some time deals with environmental impact assessment (EIA). Public participation is required in most environmental impact assessment programmesaround the world. However, citizen involvement is often reduced to a procedural exercise instead of a substantive process to include the public in environmental decision making. This paper examines public participation in EIA and provides ways to improve its effectiveness. We first examine the rationales for public involvement and its institutionalization through EIA. Next, we analyse the shortcomings and strengths of common approaches to public involvement. Our analysis, supported by two case studies, suggests that going beyond the minimum requirements can benefit the public, the project proponent and the final plan. We conclude with practical steps to improve public participation programmes in environmental planning and decision making.  相似文献   

5.
环境影响评价制度和社会稳定风险评估制度作为预防和控制环境影响、创新社会风险管理的重要制度,实施以来发挥了重要作用,但也出现了工作边界和内容范围交叉的问题。尤其是近年来,环境污染焦虑引发社会风险事件的建设项目不断增多,导致两者的"天然联系"愈发紧密,工作存在模糊地带的问题愈发凸显,致使建设项目行政审批繁复、执行力差。在梳理环评、稳评的发展历程和存在问题的基础上,深入分析了环评和稳评的法律地位、适用范围、评价目标、评价内容、实施主体和程序上的异同,剖析了两者在制度设计和内容衔接方面的关系,并从理清工作边界职责、环境社会风险评估结果共享、强化稳评公众参与等方面提出了环评和稳评政策衔接的建议,为政府有效实施建设项目环境、社会监管提供决策参考。  相似文献   

6.
Experiences with environmental impact assessment (EIA) in a number of countries are discussed in the light of both explicit and implicit goals and objectives. Adequate environmental information is not always available to decision makers because of failure to apply EIA to all relevant decisions, the continuing inadequacies of prediction and evaluation techniques, the failure to consider alternatives adequately, and the bias of some EISs. EIA frequently results in changes to proposals and may result in stricter environmental management conditions in some cases, but some people regard it as a failure because it has not stopped development. Generally, EIA leads to better integration of environmental factors into project planning. Open procedures and freedom of information encourage responsiveness to EIA procedures, which can be weakened by discretionary powers and lack of access to the courts by public interest groups. However, legal standing may have side effects that offset its advantages. EIA can encourage cooperation and coordination between agencies but does not ensure them. Similarly, it can have a limited role in coordinating interstate and international policies. In the long term, the success of EIA depends on adequate monitoring, reassessment, and enforcement over the life of the project. EIA has generally opened up new opportunities for public participation, and may help to reduce conflict. EIA procedures need to be integrated with other environmental protection and development control programs, and various means exist for reducing its cost to developers and the public.  相似文献   

7.
Urban transportation projects are essential in increasing the efficiency of moving people and goods within a city, and between cities. Environmental impacts from such projects must be evaluated and mitigated, as applicable. Spatial modeling is a valuable tool for quantifying the potential level of environmental consequences within the context of an environmental impact assessment (EIA) study. This paper presents a GIS-based tool for the assessment of airborne-noise and ground-borne vibration from public transit systems, and its application to an actual project. The tool is based on the US Federal Transit Administration's (FTA) approach, and incorporates spatial information, satellite imaging, geostatistical modeling, and software programming. The tool is applied on a case study of initial environmental evaluation of a light rail transit project in an urban city in the Middle East, to evaluate alternative layouts. The tool readily allowed the alternative evaluation and the results were used as input to a multi-criteria analytic framework.  相似文献   

8.
Cross-city analysis in environmental regulation within non-democratic political systems is a neglected area. Taking policy convergence and styles of regulation as the focus, this paper has taken an initial step to compare the environmental impact assessment (EIA) regulation in Hong Kong and Shanghai. In this comparative exercise, it is identified that policy convergence occurs more explicitly in policy ideology and policy consequences, whereas divergence takes place in policy content, regulatory process and public consultation. Convergence, however, is only superficial whereas divergence is substantial. Indeed EIA systems of these two jurisdictions have displayed contrasting styles of regulation. The formal EIA system in Shanghai is dominated by the environmental agency, which regulates informal politics in the EIA process within a legal format. The informal EIA system in Hong Kong is co-ordinated by the environmental agency, which seeks active co-operation with the clients in a consultative EIA process in an informal and discretionary manner. What makes the Hong Kong system superior to the Shanghai system is the existence of institutional channels for public consultation. Within a non-democratic political setting, the EIA process in Hong Kong is more transparent and the EIA system is more accountable to the public, whereas the EIA process in Shanghai is lacking in transparency and the EIA system is under tight bureaucratic control.  相似文献   

9.
ABSTRACT: Social scientists were included in the planning and design for an integrated, trans-basin water resource project. Within this complex project, a socioeconomic impact assessment (SIA) concentrated on identifying the social, political, and economic issues and potential impacts inherent in developing a city's water rights. Before the SIA began, some of the development alternatives had already generated widespread hostility and organized opposition from communities within the watershed. The SIA involved residents of affected communities in the study design and project planning. The study found a number of components that constituted the concerns, beliefs, and expectations about perceived, potential impacts that might result from the different alternatives. In most cases these issues constituted threats to valued environmental resources, valued community resources, the social environment, the economic base, and a secure future. The social science component was a key factor in the ultimate decision to pursue a particular alternative which was sensitive to the social and political issues, minimized environmental and socioeconomic impacts, and ultimately had support among the communities potentially affected. The experience from this case study suggests that the approach used can be applied successfully in the planning of other water development projects and result in cooperation from the wide range of interest groups that often present costly obstacles to such projects.  相似文献   

10.
The literature guides environmental planning and, specifically, how to use ecological rehabilitation projects to achieve long-term planning goals and landscape-scale environmental sustainability. There is, however, a perceived gap between principles in the literature and the use of them by practitioners involved in smaller-scale ecological rehabilitation projects. Using interviews with practitioners involved in 11 projects within the Regional Municipality of Waterloo, Ontario, Canada, we tested whether practitioners used five principles for effective planning and implementation of ecological rehabilitation that we derived from the literature. These five principles were: establishing political and ecological context, using ecologically appropriate objectives and practices, using comparative multidisciplinary and cross-scale approaches, using adaptive planning and implementation, and establishing good communication within and external to projects. Few projects followed all five principles, and practitioners indicated that they used three more project-specific principles: obtaining political/social support, promoting projects and changing attitudes about projects, and securing sufficient and persistent funding to maintain a project's life. While the literature emphasizes that ecological rehabilitation is only effective if projects are coordinated on a watershed basis, most practitioners focused solely on the goals of their specific project. The gap between literature and practice may arise because most practitioners are new to the field of ecological rehabilitation and still are focused on the methods involved. Time pressures force practitioners to obviate the literature and get projects started quickly, lest support evaporate. Complicating these difficulties is decreased support from federal and provincial governments for large-scale environmental planning. It is unclear whether ecological rehabilitation projects in Waterloo Region (at least) will ever become effective at promoting landscape-scale ecological goals or remain smaller-scale stop-gaps.  相似文献   

11.
The Environmental Impact Assessment (EIA) was first entered into force in the United States of America in 1969 through the National Environmental Policy Act. Since then, the EIA was implemented in many other countries. In Ethiopia, EIA was formally introduced in 2002 by Proclamation No. 299/2002 after the establishment of the Environmental Protection Authority (EPA) in 1995 and the formulation of the Environmental Policy of Ethiopia (EPE) in 1997. This study, which is based on a document review, interviews, and the application of a survey questionnaire, analyzes the procedures and practices of the Ethiopian EIA system, seeks to clarify fundamental information regarding the EIA system and characteristics of the key elements of EIA processes, and finally, offers suggestions that could improve EIA practices in the country. The overall result of this study shows that Ethiopia adopted EIA procedures that are similar to western models; however, despite approximately 15 years of experience, its implementation is still poor to the point that the use of EIA as an instrument of environmental management could be questioned. The challenges identified by this study include institutional, organizational, and professional capacity gaps, which, in turn, have resulted in constraints ranging from improper screening, scoping, and production of EIA reports to ineffective review, monitoring, and post‐project evaluation. Additional challenges to the system include poor governance and corruption, rapid economic growth, and the mushrooming of micro‐ and small‐scale enterprises that cause pollution and environmental degradation. This article also provides comprehensive suggestions to improve EIA practices in Ethiopia.  相似文献   

12.
海洋油气开发工程环评中公众参与探讨   总被引:2,自引:2,他引:0       下载免费PDF全文
根据我国环境影响评价公众参与现状和海洋油气开发工程公众参与实践,对海洋油气开发工程环评中公众参与进行初步探讨。目前海洋油气开发工程公众参与存在的问题主要有:相关公众界定较难、公众主要是在环评机构主导下的被动参与、信息不对称使公众难以正确表达意见、相关公众中个人的环境素养和法制意识不高。根据存在的问题,建议通过以下方法提高海洋油气开发工程环评公众参与水平:研究制定海洋工程公众参与技术方法规范;掌握好公众参与时机,尽早启动,调动公众主动参与;科学确定公众范围,选择好公众参与对象;结合实际选择公众参与方式。  相似文献   

13.
Summary The Commission of the European Communities' directive on environmental impact assessment (EIA) finally came into force in July 1988. The main provisions of the Directive are described, together with the objectives it is intended to achieve and the key areas where member state legislation will need to be effective if the principal requirements of the Directive are to be properly implemented. These include adequate coverage of projects, sufficient information in EIA studies, and effective consultation and public participation. Most European countries have some experience with EIA but, as illustrated by the UK Channel Fixed Link reports, the quality of the studies undertaken is very variable. Recommendations are made for improvements in practice through more effective diffusion of best practice, better provision and use of EIA guidance, more focused EIA research, more effective consultation and closer collaboration between the different parties involved in the EIA process, and both quantitative and qualitative improvements in EIA training. The results of a recent survey of European EIA training activity indicate growing interest, but further progress in improving the provision of EIA training is needed before the Directive can be effectively implemented.Drs Christopher Wood and Norman Lee have both been involved on various Environmental Impact Assessment (EIA) studies for the European Commission and have written widely on EIA and related topics. Both are Senior Lecturers at the University of Manchester and they are co-Directors of its EIA Centre. Christopher Wood teaches mainly in the Department of Town and County Planning, Norman Lee in the Department of Economics.  相似文献   

14.
This article investigates the involvement of local stakeholders in the environmental impact assessment (EIA) processes of Ghana’s first off-shore oil fields (the Jubilee fields). Adopting key informants interviews and documentary reviews, the article argues that the public hearings and the other stakeholder engagement processes were cosmetic and rhetoric with the view to meeting legal requirements rather than a purposeful interest in eliciting inputs from local stakeholders. It further argues that the operators appear to lack the social legitimacy and social license that will make them acceptable in the project communities. A rigorous community engagement along with a commitment to actively involving local stakeholders in the corporate social responsibility (CSR) programmes of the partners may enhance the image of the partners and improve their social legitimacy. Local government agencies should be capacitated to actively engage project organisers; and government must mitigate the impact of the oil projects through well-structured social support programmes.  相似文献   

15.
湖库底泥疏浚工程环评技术要点   总被引:1,自引:0,他引:1  
郭艳娜  陈国柱  赵再兴  常理 《四川环境》2010,29(5):36-39,45
底泥疏浚是治理污染水体的重要手段之一,通过对污染底泥的疏浚,可清除内污染源。作为环境治理工程,在水资源和水环境保护方面具有重要作用,但是工程实施过程中将不可避免地要产生一些污染物,同时也会造成水体水生生态系统的破坏。本文结合国内已完成的滇池、巢湖、太湖底泥疏浚工程的环境影响报告,对此类项目环境影响评价的技术要点进行探索和分析,为开展类似项目环评提供借鉴。  相似文献   

16.
Environmental impact assessment (EIA) procedures have been in existence in the People's Republic of China over the last decade. The impetus for China's introduction of EIA was provided by the Environmental Protection Law of the People's Republic of China, which was adopted by the Fifth National People's Congress in 1979. The EIA process, which is administrative and not statutorily mandated, has been applied primarily to construction projects. Four stages are typically involved in an EIA investigation: design of the investigation, evaluation of background environmental quality, prediction of environmental impacts, and an assessment and analysis of the environmental impacts. A variety of approaches is used for predicting and analyzing environmental impacts, ranging from ad hoc methods to fairly sophisticated mathematical models. The results of the EIA investigation are compiled in an environmental impact statement, which is used as the basis for decision making by personnel in environmental protection departments. The EIA process does not include provisions for citizen notification or involvement. Views differ concerning the effectiveness of the EIA program in protecting China's natural, social, and cultural environments. Some hold that the EIA program has brought about improvement in environmental protection, while critics contend that the program has had little effect in the prevention of pollution. However, most, if not all, observers seem to feel that the program should be continued and improved. A major avenue for improvement is to place the evaluation of a particular project in a regional context. An earlier version of this paper was distributed at a workshop on Environmental Assessment Development Planning held in conjunction with the VII Annual Meeting of the International Association for Impact Assessment, Brisbane, Australia, July 5–8, 1988.  相似文献   

17.
ABSTRACT: Successful watershed management requires consideration of multiple objectives and the efficient use of scarce public and private resources. One way to address these multi-faceted issues is through Social Benefit-Cost Accounting (SBCA). SBCA is a systematic method of addressing complex social and economic issues relevant to proposed watershed management projects. Benefits of using this technique include: benefits and costs of watershed projects are better understood; politically sensitive issues tend to be put into perspective; and stakeholders' interests are placed on a level playing field. An example from Bogota, Colombia demonstrates how SBCA can be used to value the benefits and costs of a proposed project. By addressing the benefits and costs to all stakeholders, the design of watershed management programs can be improved to achieve goals in a cost-effective manner.  相似文献   

18.
ABSTRACT

To date, research on mine remediation in North America has focused primarily on technical management; relatively less is known about the historical, political and social dimensions of remediation. Remediation, as a continuation of the mining process, alters local landscapes and economies and can be both dangerous and beneficial for surrounding communities. Because remediation projects tend to focus on the technical aspects of clean-up, such projects risk overlooking the environmental injustices associated with past development and obscuring blame or responsibility from industry and government for environmental degradation. Insofar as it is understood as cleaning up or repairing environmental damage, remediation is generally seen as “doing the good” and is less amenable to political or ethical challenges based on community concerns or values. This paper argues that greater attention needs to be paid to public participation and justice concerns associated with cleaning up mine sites. Drawing from the literatures on ecological restoration, environmental justice, reconciliation, discard studies, and matters of care, we highlight critical, yet overlooked issues in the remediation of post-mining landscapes. We argue that remediation projects present a unique opportunity for the negotiation and articulation of morals, values, histories, and physical experiences associated with mine sites and we seek to re-frame remediation as an ongoing, creative process of community healing.  相似文献   

19.
Since environmental impact assessment (EIA) is concerned primarily withsignificant environmental impacts, the concept of impact significance deserves to be defined and applied rigorously. In this article use of the term over the past 15 years in EIA documentation is reviewed. Some recent attempts at elucidating the concept are summarized. Four perspectives on impact significance that emerged from a series of workshops on the ecological basis for EIA are presented. These perspectives include (a) statistical (related to problems of isolating project-induced changes from natural variation), (b) ecological (related to the importance of project-induced changes from a purely ecological perspective), (c) social (related to the acceptability of project-induced changes in important environmental attributes), and (d) project (related to whether project-induced changes will indeed influence project decision making). The following synthesis is proposed: Any exercise in judging the significance of an environmental impact should thoroughly consider (a) the importance of the environmental attribute in question to project decision makers, (2) the distribution of change in time and space, (c) the magnitude of change, and (d) the reliability with which change has been predicted or measured. The implications of considering these factors are discussed.  相似文献   

20.
Partnerships and co-operative environmental management are increasing worldwide as is the call for scientific input in the public process of ecosystem management. In Hawaii, private landowners, non-governmental organizations, and state and federal agencies have formed watershed partnerships to conserve and better manage upland forested watersheds. In this paper, findings of an international workshop convened in Hawaii to explore the strengths of approaches used to assess stakeholder values of environmental resources and foster consensus in the public process of ecosystem management are presented. Authors draw upon field experience in projects throughout Hawaii, Southeast Asia, Africa and the US mainland to derive a set of lessons learned that can be applied to Hawaiian and other watershed partnerships in an effort to promote consensus and sustainable ecosystem management. Interdisciplinary science-based models can serve as effective tools to identify areas of potential consensus in the process of ecosystem management. Effective integration of scientific input in co-operative ecosystem management depends on the role of science, the stakeholders and decision-makers involved, and the common language utilized to compare tradeoffs. Trust is essential to consensus building and the integration of scientific input must be transparent and inclusive of public feedback. Consideration of all relevant stakeholders and the actual benefits and costs of management activities to each stakeholder is essential. Perceptions and intuitive responses of people can be as influential as analytical processes in decision-making and must be addressed. Deliberative, dynamic and iterative decision-making processes all influence the level of stakeholder achievement of consensus. In Hawaii, application of lessons learned can promote more informed and democratic decision processes, quality scientific analysis that is relevant, and legitimacy and public acceptance of ecosystem management.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号