首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   3篇
  免费   0篇
环保管理   2篇
基础理论   1篇
  2002年   1篇
  2001年   1篇
  1997年   1篇
排序方式: 共有3条查询结果,搜索用时 15 毫秒
1
1.
First-generation compensation plans (CPs) for Dutch highway projects have been evaluated with respect to implementation of the compensation principle (1993), which aims to counterbalance the adverse ecological impacts of large-scale development projects. Decision-making on the seven projects took place between 1993 and 1995. Specifically, we considered: (a) the processes employed to prepare and implement the compensation plans; (b) the methods used to identify, plan, and execute the compensation measures; and (c) the results yielded by these methods. We conclude that the CPs were prepared fairly uniformly, particularly in terms of the processes and methodologies used to derive compensation measures. Five of the seven CPs had become operational by 2001 and initial experience is now being gained on land acquisition and transfer of compensation sites to nature conservation trusts. Further progress of CPs is likely to be seriously hampered by growing demand for land for development in general and associated increases in real estate prices. Several problems are addressed and recommendations made with respect to: (a) developing a legal basis for the compensation principle; (b) the relationship with re-allotment projects; (c) estimation of compensation costs; (d) an annual bias of CP budgets to account for rising costs; (e) contingency measures; and (f) criteria for CP (ex-post) evaluation.  相似文献   
2.
First-generation compensation plans (CPs) for Dutch highway projects have been evaluated with respect to implementation of the compensation principle (1993), which aims to counterbalance the adverse ecological impacts of large-scale development projects. Decision-making on the seven projects took place between 1993 and 1995. Specifically, we considered: (a) the processes employed to prepare and implement the compensation plans; (b) the methods used to identify, plan, and execute the compensation measures; and (c) the results yielded by these methods. We conclude that the CPs were prepared fairly uniformly, particularly in terms of the processes and methodologies used to derive compensation measures. Five of the seven CPs had become operational by 2001 and initial experience is now being gained on land acquisition and transfer of compensation sites to nature conservation trusts. Further progress of CPs is likely to be seriously hampered by growing demand for land for development in general and associated increases in real estate prices. Several problems are addressed and recommendations made with respect to: (a) developing a legal basis for the compensation principle; (b) the relationship with re-allotment projects; (c) estimation of compensation costs; (d) an annual bias of CP budgets to account for rising costs; (e) contingency measures; and (f) criteria for CP (ex-post) evaluation.  相似文献   
3.
Sampling designs considered for a national scale environmental monitoring programme are compared. Specifically, design strategies designed to monitor one aspect of this environmental programme, agro-ecosystem health, are assessed. Two types of panel survey designs are evaluated within the framework of two-stage sampling. Comparisons of these designs are discussed with regard to precision, cost, and other issues that need to be considered in planning long-term surveys. To compare precision, the underlying variance of a simple estimator of mean difference is derived for each of the two designs. A variance and cost model accounting for the different rotational sampling schemes across designs are developed. Optimum stage allocation for each design are assessed with the variance-cost models. The best choice of design varied with the conditions underlying the variance model and the degree of other sources of survey error expected in the programme.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号